Murata Announced Completion of New MLCC Production Building at Fukui
- Posted by doEEEt Media Group
- On February 15, 2020
- 0
Fukui Murata Manufacturing Co., Ltd. (Echizen City, Fukui Prefecture), a manufacturing subsidiary of Murata Manufacturing Co., Ltd., commenced clearing of the newly acquired land in June 2018 and proceeded with the construction of the new production building in September 2018. Construction has been finished, and a completion ceremony was held on Tuesday, February 4.
The completion of the new production building enables the company to build a system able to respond to the anticipated increase in demand for ceramic components over the medium-to-long-term. The expected demand will primarily be driven by the increasing sophistication of electronic devices and the electrification of automobiles.
Fukui Murata Manufacturing Co., Ltd. business focus is development and manufacture of ceramic-based electronic components (multilayer MLCC capacitors, noise-suppressing products, etc.)
Source: Murata
- Managing EEE components for LEO and lower cost space missions - December 17, 2024
- Filtering Characteristics of Parallel-Connected Fixed Capacitors in LCC-HVDC - November 21, 2024
- ALTER SPACE TEST CENTER: testing approaches for New Space - September 30, 2024
0 comments on Murata Announced Completion of New MLCC Production Building at Fukui